Band Shrink 240 specs
The Band Shrink 240 is specified for beverage plants that need two neck-band streams on one machine. Treat 120 bottles per minute per lane as a target reached after the cut band lands square, the bottle spacing holds steady through the steam chamber, and exit water is under control on the actual SKU. At 240 bottles per minute combined, small pitch errors show up quickly as skew bands.
The 4.0 kW electrical input covers the drive and controls; the shrink work comes from steam. Power must be ready at the bay with a clean isolator, while steam must reach the manifold at steady pressure during twin-lane running. Plan condensate drainage and dry exit space so water does not collect under bottles or around the sleeve skirt.
Prepare the bay and sleeve format
Before installation, confirm cap-fitted neck diameter, cap height, shoulder shape and bottle pitch for each SKU. The Band Shrink 240 runs twin sleeve lanes for 28, 33, 38 and 45 mm neck finishes. On the floor, prove the sleeve lay-flat on a capped bottle, then mark where the band must sit and where the tear line must face after shrink. For new film or artwork, compare the chosen band against the band sleeve size guide before a roll is cut.
Prepare steam, power, ventilation and cleaning access before the machine is positioned. Fit the steam line so the manifold can be isolated and drained without shifting the applicator. Keep both sides open for sleeve loading, guide adjustment and wet film scrap removal. Twin-lane beverage running produces start-up water, so route condensate away from operators and electrics.
Mechanical fit and first settings
Set the frame square to the conveyor and bring each lane centre onto the bottle path. Guide rails should hold bottles upright without squeezing light PET panels. The sleeve feed must present cut bands at the same angle on both streams. For frequent changeovers, a matched sleeve feed tray follows the Band Shrink 240 lane spacing.
Start with a sleeve landing point that keeps the tear line straight after shrink. Set bottle pitch so one bottle does not rob steam from the next inside the chamber. Bring steam pressure up gradually, then adjust dwell by line speed until the upper edge pulls tight around the cap and the lower edge grips the neck without curling.
Sample run and acceptance checks
Run a short sample on water-filled bottles or saleable test packs from the same capper setting. Check both lanes separately, then together. Look for shoulder wrinkles, loose lower edges, bands sitting high on one side, tear perforations turned away from the consumer panel and wet patches at the exit. If one lane is clean and the other is skew, correct lane centre before raising steam pressure.
Acceptance should be written against settings and pack result. Record the pressure at the manifold, the line speed used for dwell, warm-up time, film type, band cut length, sleeve lay-flat, tear-line clock position, bottle spacing through the machine and the condition of the pack at discharge. Keep retained samples from left and right lanes. For commissioning, book through commissioning support or send trial notes through our contact form.
Handover notes and sizing information
At handover, give the setter a start-up order: drain condensate, warm the steam path, run low speed, check sleeve landing, then raise to production rate. Maintenance notes should cover manifold cleaning, worn guide faces, loose sleeve stops, nearby wet plugs and steam hood sealing. Operators should know which defects point to sleeve fit, dwell or lane alignment.
For sizing, send the bottle drawing or sample, capped neck diameter, cap height, shoulder photo, film type, target lane rate and the planned distance from bottle centre to bottle centre. Include the band lay-flat, cut height, tear-line clocking and a photo of the bottle before and after the steam chamber. If the sleeve is already printed, send a short video of the band entering the Band Shrink 240 so lane alignment and drying can be checked against the pack.
| Model | Band Shrink 240 |
|---|---|
| Rate band | Up to 240 bpm combined |
| Power / utilities | Steam + 4.0 kW |
| Neck / format | Twin sleeve lanes |
Parent: Band Shrink 240.
What our Bottle Sealing customers say
Verified Google reviews
