Line applications lead

Ms Khanyisile Mdletshe

Khanyisile maps co-pack briefs to induction and band cells across Gauteng.

Ms Khanyisile Mdletshe

Ms Khanyisile Mdletshe is the line applications lead for Gauteng co-pack work, mapping customer briefs into induction sealing, band shrink and rail layouts. Plant managers call for her when a new SKU, mixed pack or tamper-evident pack needs a measured line plan that setters and maintenance teams can run. She works with the wider team on briefs from trial to production.

A normal week includes site surveys, counter brief notes and handover packs for sales and parts. She walks the capper discharge, checks bottle control at the transfer points and marks the clear working area needed around the proposed sealer or steam tunnel position. Her handover names the samples received, the parts to be collected and the production notes that must follow the job into setup.

Induction checks

For induction work, Khanyisile measures the neck finish, checks cap torque and records the working distance from the cap top to the induction head face. On Seal Induction Pro jobs she writes down power setting, line speed, foil appearance, sample peel result and leak test result, giving the plant a starting recipe for the next production run.

Her induction record is built for changeover use, so the setter can see what was proven when the pack was trialled. A sauce line may need a different cap torque after a closure change, while a nutraceutical bottle may need closer attention to foil placement during short runs. Khanyisile separates the packaging fault from the machine setting, then records the change that cleaned up the samples.

Band shrink and steam work

On Band Shrink 120 jobs, Khanyisile records the sleeve cut size, band depth, tear line position, bottle pitch, steam gauge reading, time in the tunnel and blow-off condition. She watches how the sleeve sits on the neck before steam, then checks whether the band grips cleanly after the tunnel. For heavier packs, she checks container footprint before tunnel selection.

If a job needs rails, Khanyisile sketches the Line Integration Rail position with sensors, guide points and reject position marked. That sketch gives maintenance a shared reference when a capper, sealer or tunnel must share a tight production cell without blocking access for changeovers and cleaning.

Fault tracing on the floor

When a fault arrives, Khanyisile starts with the packed sample and the last good run note. For induction, she checks cap torque, foil seat, head height and one changed setting at a time. For band shrink, she checks sleeve size, steam pressure, condensate marks and bottle pitch. She avoids chasing three variables together, because that hides the cause from the setter.

If the fault points to sleeve behaviour or tunnel heat, Khanyisile brings in Mr Marnus Esterhuizen for steam tuning and lane work. If the fault points to foil wad match, she sends the neck and cap details to the foil specialist. Her own handover stays on layout, setting history and operator steps.

When to ask for Khanyisile

Ask for Khanyisile when a Gauteng co-pack brief needs a line walk before quoting, when a capper has moved and seals have changed, or when a new sleeve pack must fit into a tight production cell. For this type of visit, send us the container, closure, pack style, current layout and photos of the space where operators load, clear jams and clean around the sealer or tunnel.

Talk to the sealing counter

Contact form · Meadowdale Industrial, Germiston