Cap Torque Station specs
Start the Cap Torque Station spec check at the conveyor. The rate figure, up to 90 bpm, assumes capped bottles arrive upright, evenly pitched and held square under the torque head. On the floor, the filler, cap feed and infeed must not push surges into the station. Walk the current bottle set past the proposed position and compare the job to Cap Torque Station.
The 1.5 kW servo rating tells maintenance what to prepare at the electrical panel. Confirm supply, isolator position, cable route, earth continuity and emergency-stop tie-in before the machine arrives. Leave working space for pad changes, torque testing, bottle clearing and cleaning. Keep cap dust, wet product and loose liner material away from the servo cabinet.
Set the format as a recipe
Treat the neck and format figure as a recipe task. Each closure and neck finish gets its own stored torque band, with target, upper limit and lower limit taken from the cap drawing, liner note or plant standard. A 28 mm closure, a ribbed personal-care cap and a wider chemical cap belong on separate recipes, even on the same conveyor.
Match the torque head pad to the closure face during setup. The pad should grip squarely without polishing ribs, climbing the cap edge or marking the top. Pad hardness, closure height and cap texture change the torque result. Plants keeping change parts for setters can list the pad against torque head pad.
Prepare the bay and fit the station
Set the machine position after checking bottle height, cap height, conveyor centre line and the straight section available for guide control. Guides must hold the bottle body without squeezing soft panels. The outfeed must take bottles away without twisting freshly capped packs. Where a new cell is being built, the Line Integration Rail sets the capper on a fixed mounting base, with guide brackets and sensor slots positioned for torque work.
During installation, align the infeed, set the head centre over the cap, check bottle-present sensing and jog the servo before production speed is attempted. Name the first recipe with product, cap size, neck finish and closure supplier, so a setter can select the correct programme during a mid-shift SKU change.
Run samples and accept the setting
Load the recipe, fit the pad, bring the guides onto the bottle and run filled or weighted samples at crawl speed. Watch for cap rock, cross-threading, bottle stall, pad slip and scuffed cap tops. Raise speed only when torque readings repeat and the bottle path stays straight through the station. Where induction sealing follows, the cap load should press the liner evenly onto the neck sealing surface.
Acceptance is done with the plant torque tester and retained samples taken as the proving run opens, settles and finishes. Record loose caps, over-tight caps, split closures, stripped threads, neck damage and every recipe adjustment made. A short cap may pass by eye and still sit below the pad contact face, so include cap-height checks with the torque readings.
Handover and sizing details
At handover, write down the recipe name, drawings used, torque limits, pad fitted, guide positions, sensor positions, conveyor speed used for acceptance and the torque tester reference. Maintenance notes should cover pad wear, cap dust removal, sensor face cleaning and the next torque verification date. Operators should know how to stop the station, clear a trapped bottle and reload the recipe after a power restart.
For sizing, send bottle photos, cap samples if available, neck finish drawing, closure drawing, filled bottle mass, target line rate, conveyor width, conveyor height, cap supply method and required application torque. For a torque-station size check, send the pack details through our contact form so head height, pad contact and guide travel can be checked against the proposed bay.
| Model | Cap Torque Station |
|---|---|
| Rate band | Up to 90 bpm |
| Power / utilities | Servo 1.5 kW |
| Neck / format | Recipe torque bands |
Parent: Cap Torque Station.