Induction checks before export week
What the seal counter verifies before a container leaves Germiston.
Induction checks before export week
Export week punishes weak induction work. Once cartons are closed and pallets are wrapped, a poor seal becomes a transport, claims and rework problem. The check has to start at bottle level: cap, liner, neck finish, torque, seal setting and opened samples. A plant manager needs a record that shows what passed, what failed and what was changed before dispatch from Germiston.
For an export-week check, book the SKU through our contact form and keep the job card, cap sample, filled bottle and liner pack together for the test. Send the neck size, cap type, product fill condition and planned dispatch date in the same note. The counter note gives the line setter a plain record for the export pack file.
Why faults appear late in export week
Most faults come from normal South African line pressure. A capper is reset after another SKU, labels slow bottle flow, closures arrive with liners seated at different depths, or product wets the bottle land during filling. Heat, dust and long shifts add variation. On an induction line, correct torque holds the liner flat on the land so the heat seal layer can bond to the plastic surface.
The common export faults are off-centre liners, a narrow unsealed arc, scorched backing, cap movement after sealing, product on the neck, or the wrong wad diameter. The check must match how the pack is actually sealed: conveyor production through Seal Induction Pro, or short contract batches set up on benchtop Seal Induction Compact.
Step-by-step check on the seal floor
Start with ten capped bottles from normal running, not hand-picked starts. Confirm the liner and die against the job-card neck using the Foil & Die Kit record. Check cap application on the same bottles, run them through the sealer at planned pace and power, then open samples after the cap and liner have cooled for a fair peel test.
Record cap torque before the peel test because torque explains many mixed results. A low reading points to poor liner contact; a high reading can deform the cap or neck finish. Where heads vary across the capper, the Cap Torque Station recipe sheet gives QA and maintenance a common starting point for the export run.
What the export seal card must show
The card should name the SKU, batch or job card, pack material, neck finish, closure supplier, liner grade, sealer used, head height setting, power setting, line pace, torque readings, sample count and pass or rework result. Add short notes for opened samples: full ring, lifted sector, scorched liner, wet land, torn backing or cap movement.
Inline inspection can reduce argument on long export runs. Seal Inspect Vision can flag missing foils and weak seal areas at line pace, then sends rejects to a pocket for counter review. The manual card still matters because a camera reject shows the event, while the peel test shows the bond on the bottle land.
Worked example from a typical line
A sauce co-packer in Ekurhuleni prepares a mixed export week on 38 mm PET bottles. The first ten opened samples show two lifted sectors. Torque readings vary across the capper, and three liners sit off-centre inside the closure. The setter corrects the closure feed, resets the capper, confirms the wad against the neck chart and runs a fresh sample set.
The second set shows a full seal ring on every opened bottle, with no cap movement after cooling. The record lists the original fault, the capper adjustment, the sealer setting, the opened-sample outcome and the batch release name. That note travels with the production job card, so the plant manager can prove the export-week seal check was completed before the pallet departed Germiston.