2026-09-05

Reject pocket timing on short rails

Air blast timing that clears a miss without knocking good bottles.

By Mr Johan van Wyk · Sealer commissioning

Air-blast reject pocket clearing a miss on a short rail

Reject pocket timing on short rails

On a short sealing rail, the reject pocket has seconds to act and centimetres to spare. A missed foil, crooked cap or failed vision call must be blown into the pocket without touching the next saleable bottle. The setting is a timed event from sensor trigger to pocket entry, followed by a pulse long enough to move one reject sideways and no longer.

South African lines often run mixed neck finishes, reused conveyors and compact retrofit bays, so last month’s timing note may be wrong after a SKU change. A 28 mm sauce bottle, a 38 mm oil bottle and a square household-chemical pack present different side area to the air jet. On a Line Integration Rail, the short rail length and 24 V sensor position make measurement on the actual bottle the starting point.

Why short-rail rejects drift

Most bad rejects come from three faults: delay too short, pulse too long or bottle spacing not logged. If the jet fires early, the bottle is still upstream and rocks back into the lane. If the jet stays on, it catches the following pack. Condensate after sleeve shrinking, oily bases and worn belts can change the sideways slide, so timing must be proved on running product.

Commission the delay and pulse

Use a simple commissioning sequence. Fit the reject pocket level with the bottle body, square the opening to the belt and set guides so the normal lane cannot drift towards the pocket lip. Mark the leading edge of the pocket with tape. Run one bottle at production speed, trigger from the reject sensor and time from sensor face to that tape mark.

Enter that value as the first delay, then trim the pulse. Start short, fire one known reject and watch the base, not the cap. Lengthen the pulse until the bottle clears the belt and lands inside the pocket without bouncing out. If it clips the front lip, move the pocket or nozzle first. A cap-height blast tips narrow bottles and creates double rejects.

Record what changes between SKUs

Record the changeover data beside the line: SKU, neck finish, bottle diameter, fill mass, conveyor setting, actual bottle pitch, sensor mounting position, delay, pulse length, nozzle angle and air pressure. Keep separate entries for round, oval and square packs. Where a sensor kit has been moved, write the new distance to the pocket because even a small shift changes the delay.

When Seal Inspect Vision calls a missing liner or incomplete seal, map that output to the same timed reject event. Clean the sensor lens, check the 24 V plug, drain wet air from the filter bowl and inspect guide clamps at every size change. After steam sleeving, time the dried bottle; sleeve edges and condensate can alter pocket entry on tall personal-care and sauce packs.

Worked timing example

Worked example: a 60 bpm line with a 28 mm neck has one-second pitch. A timed pass shows 430 ms from trigger to pocket edge. Set 430 ms delay, fire an 80 ms pulse, then test three induced misses. If one bottle hangs on the belt, try 100 ms. If the next bottle shivers, return to 90 ms and move the nozzle closer.

For commissioning support, Mr Johan van Wyk checks reject timing on customer floors. Bring timing sheets or sample bottles to the counter in Meadowdale Industrial, Germiston, or send a message through our contact form with bottle photos, pitch, speed, pocket distance and nozzle angle.

What our Bottle Sealing customers say

Verified Google reviews

Talk to the sealing counter

Contact form · Meadowdale Industrial, Germiston