Band Shrink 240 launch

Dual-lane band shrink for beverage peaks ships to SA co-packers.

Band Shrink 240 launch

2 August 2026, Germiston: Band Shrink 240 has been launched for South African beverage peak runs, running two parallel sleeve lanes, each rated at 120 bpm, from a common steam set-up. The launch centres on cap-band shrink performance: stable pressure at the hood, enough time in steam, correct sleeve size, clean tear-start position, bottle spacing, condensate removal and a dry exit.

The launch affects beverage production teams handling water, RTD and soft-drink packs through short seasonal windows. One sleeve lane can become the hold point after filling and capping. The new format gives those teams a paired sleeve cell with one steam set-up and matched lane behaviour.

Why the change was made

The request came from beverage co-pack plants that already know their neck-band process but need more output during peaks. The customer situation is familiar: a capper can keep pace, pallets are waiting, and sleeve application starts banking bottles. Band Shrink 240 targets that floor problem with twin sleeve flow.

The run still starts with the sleeve drawing: the flat band width must suit the neck finish, the cut height must cover the cap skirt correctly, and the tear start must land where a shopper can grip it. Steam then pulls the band to the bottle profile, so pressure and dwell must suit the cap shape and shoulder.

How customers run it

Changeover starts at the sleeve feed tray, where both lanes are set to present the same band height. The setter checks bottle pitch, guide pressure and neck spacing before steam is brought up. A short sample run confirms that both lanes shrink to the same top edge and lower edge.

During production, operators watch for a square band, a clean tear line and a dry outlet. Too little dwell can leave loose corners or small ears at the sleeve seam. Too much dwell can pull the sleeve low, distort the perforation or mark lightweight beverage bottles after they pass through the steam zone.

Fit notes and fault finding

Sleeve fit remains the first control point. Excess flat width shows up as post-shrink creasing; undersize bands can split along the tear cut or climb above the cap edge. Sleeve height must grip the cap skirt while keeping the tear line accessible. Close bottle pitch can shield necks and cause uneven shrink.

Maintenance checks are practical: inspect the steam hood seal, clear drains, check hose condition, wipe sleeve contact areas and confirm that first condensate is discharged during warm-up. Wet discharge usually points to blocked drainage, low drying space or steam pressure movement. Twisted bands usually point to tray position, guides or sleeve stack condition.

What comes next

For a dual-lane beverage trial, send the bottle, cap, sleeve lay-flat, artwork proof and steam supply notes through our contact form. Mr Marnus Esterhuizen is handling steam and band tuning for dual-lane beverage briefs, including lane spacing, drying position and first-run checks.

The next step for plants is site fit. Teams should confirm where the paired lanes sit, how operators reach sleeve feed points, where wet bottles clear the tunnel, and how start-up checks are recorded. A floor sketch and current bottle pitch can be checked against the steam start-up sheet before placement.