2026-09-19

Power cuts and the seal counter

What to write down while power is out so restart stays calm.

By Mr Bheki Msimang · Service and spares

Seal counter notes ready for a restart after a power cut

Power cuts and the seal counter

A power cut turns a sealing stop into a memory test. Caps are half fed, bottles sit under the induction head, sleeves wait near steam, and the last good count becomes a guess unless somebody writes it down at the seal counter. The counter note is the handover between outage and restart: batch, SKU, pack size, liner or sleeve type, last accepted bottle, and the operator who made the call.

Why South African restarts go wrong

A filling room can change from a short food order to a chemical pack size in the same shift, then lose power halfway through the changeover. A line setter may be on a 38 mm sauce neck in the morning and a 45 mm chemical neck after lunch. During a power cut, air pressure bleeds, steam cools, bottles creep on the chain, and rejected packs get mixed with work in progress.

Start the outage record before anyone clears the station. Mark whether the run is induction, sleeve shrink, or both. For induction, write the neck finish in millimetres, cap type, aluminium liner code, cap torque recipe and the exact sealer in use: Seal Induction Pro for the main conveyor, Seal Induction Compact for benchtop restart work, or the hand wand. For format changes, note the die size from the Foil & Die Kit record.

The step-by-step counter method

Use one line on the sheet per stoppage. Step one: write the time power failed and the bottle count at the last accepted seal. Step two: tag the bottles between capper, sealer and outfeed as hold stock. Step three: record set height, power setting, belt speed and cap torque recipe from the job card. Step four: place loose caps, liners and rejects in marked tubs by status.

For sleeve work, keep a separate note beside the steam station. Record steam pressure, warm-up status, sleeve size across the roll, cut height, perforation position, bottle spacing, wet spots and the drying point after the tunnel. If the job runs through Band Shrink 120, record the last clean sleeve count; on Band Shrink 240, note the lane as well, with two lanes at 120 bpm each, then quarantine bottles that stopped inside the hot zone.

Checks before product returns to packing

On restart, do not chase speed first. Rebuild the line from the recorded settings, then run a small group of bottles and hold them at the counter. Open samples for peel condition, inspect the foil face and check for leaks under the plant’s QA method. On sleeve jobs, confirm shrink shape around the closure, tear line access, barcode clearance where used, and no condensate running under labels or into cartons.

Maintenance leads should add the cause code: a scheduled outage, trip after return, compressor delay, steam boiler delay, capper jam or sensor fault. That note points the next shift towards the right action. When the outage record shows a worn part, add the part name, machine model and batch number to the sheet so the replacement request matches the fault found at restart.

Worked example from a typical sauce line

A PET chutney bottle run stops at 14:02 during the scheduled power cut. The counter reads 18 430 accepted bottles. The setter writes: 38 mm neck, induction foil liner, torque recipe S38, Pro sealer settings from job card, 26 bottles held between capper and outfeed, three uncapped bottles removed. At 16:18 power returns. The team resets from the note, runs 24 bottles, opens four, leak-tests four, then releases from bottle 18 431.

That short record prevents three common failure modes: double sealing bottles that already passed, releasing packs with loose caps from air loss, and mixing unshrunk sleeves with accepted cartons. The same format fits export weeks, night shift co-packing and Monday restart after a weekend outage. Keep the blank sheet with the power-cut restart record and the seal check card at the machine.

What our Bottle Sealing customers say

Verified Google reviews

Talk to the sealing counter

Contact form · Meadowdale Industrial, Germiston