Support
Warranty
Manufacturing fault cover when used as directed.
Warranty
Warranty support starts with evidence from your production floor. Cover applies to manufacturing faults in materials or workmanship on equipment used as directed, with the purchase papers setting the cover period for that model. Plant managers usually raise a case when a sealer, shrink band unit, steam tunnel, capper, rail or inspection cell repeats a fault after normal cleaning, setting and changeover checks.
Send a message through our contact form first with the model name, purchase invoice, fault date, service dates, photos, short video if available, line speed or bpm, neck size in mm and the product format being run. Add the fault pattern: intermittent trip, weak seal, sleeve scuff, feed jam, sensor miss, controller alarm or damage noticed after a move.
Claim check and booking
The support team checks the email pack against the model record, service notes and the way the unit was set up. A claim on a Seal Induction Pro is read with cap torque, bottle land condition, aluminium liner stock and induction head position notes. A band machine claim is read with sleeve width, sleeve height, bottle pitch, steam notes and drying marks.
If the unit needs inspection away from the plant, the team books the counter intake at Meadowdale Industrial, Germiston. The customer brings the equipment, guards, cables, change parts and suspect consumables named in the return instruction. After assessment or repair, the customer collects the unit with the finding and any return-to-line notes.
Counter or on-site inspection
At the Germiston counter, intake starts with a received-items list and photos of the machine as delivered. A technician records serial details, visible damage, missing parts, adjustment positions and loose fittings. Where practical, the unit is powered, run through its controls and checked with sample bottles, caps, sleeves or foil wads that match the claim notes.
For larger line equipment, inspection can happen at your facility when the fault needs the full production setup. The maintenance lead gives access, the normal operators run the usual SKU, and the technician watches start-up, changeover and stop-start behaviour. On a Band Shrink 120, that means sleeve feed, steam delivery, tunnel dwell, condensate marks and exit handling.
What gets tested
Induction warranty checks focus on repeatable sealing behaviour under the recorded setup. The technician checks the induction head, height setting, belt tracking, sensors, cap pressure, foil liner batch and bottle finish. Failure modes suited to warranty review include controller faults, induction head faults, faulty sensors, wiring defects from manufacture, or a part that fails under normal plant use without impact or unauthorised changes.
Steam and sleeve equipment is tested around the shrink result and the parts that carry steam or sleeve movement. For a Steam Tunnel L, checks include hood seals, steam spread, drainage, bottle clearance, guide contact and wide-mouth container handling. The report separates workmanship and material faults from wear, scale build-up, knocked guides, poor sleeve match, damaged gaskets and changes made outside supplied guidelines.
What the customer has afterwards
After inspection, the customer receives a finding: accepted warranty repair, parts instruction, return-to-line adjustment, service recommendation or a chargeable repair route where the fault sits outside manufacturing cover. The paperwork lists what was tested, what was found, what was replaced and what settings were recorded, so the line setter can restore the operating window.
Warranty work often ends with housekeeping for the next run: updated service notes, a consumables check and operator points that caused confusion during the claim. Plants running fleets can pair the finding with service support, Spares & Care Kit planning and a seal check card for production sign-off.
