Steam Tunnel S specs
Use the Steam Tunnel S spec as a commissioning procedure for a compact steam chamber that finishes tamper sleeves on narrow-mouth glass or PET bottles. The up-to-100 bpm rating means the cell can hold that pace when bottle pitch is even, sleeves enter square, and dwell pulls the band tight without bottle contact inside the hot zone.
Prove the rate during sampling. A short neck band on water, RTD or syrup bottles may run near the top once spacing is settled. A taller sleeve, cold bottle, wet shoulder or soft PET wall can need slower travel so the skirt shrinks cleanly and dries before handling.
Prepare steam, drain and line space
Treat the utility entry as the steam supply specification for the chamber, not just an electrical note. Prepare a plant steam point with isolation, pressure control, a trap and a clear condensate route. The setter records working pressure for each sleeve and bottle family. Steam should wrap the sleeve zone evenly rather than push the band off-centre.
Fit the tunnel over a straight conveyor section with access to the infeed, discharge and drain points. The bottle centre must pass through the middle of the hood, with guides holding the container without rubbing the sleeve. For fresh rails or a hood refresh, check the standard guide rail and steam hood seal.
Set sleeve and bottle geometry
The narrow-mouth format note covers beverage, syrup, personal care and similar bottles where the sleeve shrinks around the closure skirt and upper neck bead. Match the lay-flat width against the cap and neck outside diameter, leaving enough freedom for square placement and enough recovery for a tight finish. Large opening containers such as jerry cans and gallon bottles are sized on Steam Tunnel L.
Set sleeve height from the tamper brief, then check where the tear perforation lands after shrink. A high tear line can pull across the cap top; a low line can leave a loose lower skirt. When an upstream Band Shrink 120 places sleeves, confirm cut height, sleeve tray position and bottle pitch against the Steam Tunnel S dwell window.
First settings and sample run
Start with the tunnel warm, the drain open and bottles spaced so shoulders do not touch in the chamber. Run a small sample at a slower conveyor setting, then lift pace toward the planned rate while watching sleeve movement at entry, shrink pull inside the hood and water carry-over at discharge. Use the steam start guide for the first run.
Typical faults point back to settings or maintenance. Loose lower skirts need more heat on the lower band or more dwell. Wrinkles near the cap often show a skew sleeve or tight lay-flat width. A sleeve blown sideways points to excess steam force or poor bottle control. Water marks call for better drainage, a clear trap and more drying time.
Acceptance, handover and sizing details
Accept the set-up when bottles leave the tunnel with the sleeve seated squarely, the tear line in the agreed position, no melted print, no shoulder drips and no scuffed bottle surface. At handover, log the SKU, bottle material, cap and neck diameters, sleeve film, flattened sleeve width, cut height, tear-perf direction, conveyor rate, bottle pitch, working steam pressure, drain condition and drying result on the handoff template.
For sizing, send bottle and cap photos, cap and neck measurements, sleeve artwork or sleeve samples, target bottles per minute, conveyor width and height, steam point, condensate route and space around the cell. For Steam Tunnel S trials, our team can review the sleeve position, steam point, drainage path and available drying distance before a sample run.
| Model | Steam Tunnel S |
|---|---|
| Rate band | Up to 100 bpm |
| Power / utilities | Steam chamber |
| Neck / format | Narrow mouth focus |
Parent: Steam Tunnel S.
What our Bottle Sealing customers say
Verified Google reviews
